Sikafloor®-215 Rapid Screed
Sikafloor®-215 Rapid Screed - a premium screed that is easy to apply with good working time, but also reaches a high strength with low moisture within 24hrs.
▪ High strength – ~40MPa after 28 days
▪ Good working time 20-30min @ 23°C
▪ Low shrinkage
▪ Tiles may be installed after 15hrs
▪ Suitable for all residential or commercial flooring installation
Usage
Sikafloor®-215 Rapid Screed is applied in combination with suitable materials from Sikafloor®, SikaBond®, Sikadur®, SikaTite® & Davco® rangesApplications are as follows
> Internal & external space
> Bonded screed from 10mm - 60mm
> Un-bonded screed from 30mm - 80mm
Advantages
▪ Pre-mixed binder with selected aggregates▪ High strength – ~40MPa after 28 days
▪ Good working time 20-30min @ 23°C
▪ Low shrinkage
▪ Tiles may be installed after 15hrs
▪ Suitable for all residential or commercial flooring installation
Packaging
20kg Bag - 48 bags per pallet
Colour
Grey powder with aggregates
Product Details
APPROVALS / CERTIFICATES
Complies with the requirements noted in
Section 1.3.12 & 3.3 of AS 1884:2021
Floor Coverings - Resilient sheet and tiles - Installation practices
Composition
Selected aggregates, cements, & additives
Shelf life
Unopened bags can be stored for up to 12 months in a cool, dry and weatherproof environment.
Storage conditions
Bags must be stored off the floor. Avoid sitting bags in direct sunlight prior to application.
System structure
Bonded Screed | Un-bonded Screed |
Option 1 Bond coat: Prohesive Promaxset Plus & water Option 2 Slurry: Lankolatex 751 & GP cement | Polyethylene sheet |
Sikafloor®-215 Rapid Screed | Sikafloor®-215 Rapid Screed |
Subsequent suitable materials | Subsequent suitable materials |
Compressive strength
~22 MPa at 1 day
~40 MPa at 28 days
Tensile strength in flexure
~7 MPa at 28 days
Reaction to fire
No hazardous combustion products are known
Application
Mixing ratio
1.9 - 2.1 Litres of clean, cool water
Ambient air temperature
5°C - 35°C
Pot Life
20 - 30 minutes @ 23°C
Waiting time to overcoating
Allow 15 hours at 23°C prior to the application of tile or levelling systems. Allow 3 days at 23°C for impervious floor coverings or membranes.
Drying is dependent on thickness of application, temperature, air flow & relative humidity. Increased air flow will help with drying speeds in cooler temperatures.
Yield
10L = 1m2 @ 10mm
EQUIPMENT
Mixing can be undertaken with:
▪ Slow speed mixing drill & pail
▪ Cement mixer
▪ Forced drum mixer
For best results a forced drum mixer or cement mixer is advised.
MIXING
Slowly add powder to the clean cool water and mix for a continuous 2-3 minutes. A semi-dry consistency must be achieved, but will form when pressure is applied. Install mixed product immediately. Not mixing for the recommended time or additional water may result in product irregularities and possible product failure.
APPLICATION
Bonded Screed Application 10mm - 60mm
For bonded screed applications a Bond or Slurry coat must first be applied prior to placement of Sikafloor®-215 Rapid Screed.
Un-bonded Screeds Application: 30 - 80mm
Lay 2 layers of polyethylene film on the substrate and tape the joins. Place the mixed Sikafloor®-215 Rapid Screed onto the polyethelene film and reinforce with galvanized wire as per applicable AS standards. Screed to falls and desired heights should be created during this process.
Primer: Bond & Slurry coat options.
Option 1 Bond coat:
Promaxset Plus mix ratio 6.5 - 6.8 Litres water per 20kg bag. Apply Bond coat to the clean susbstrate with a trowel, or broom to a depth of 2mm - 2.5mm.
Option 2 Slurry coat: 1:1 by Ratio
▪ 1 part Lankolatex 751
▪ 1 part GP cement
Apply slurry coat to the substrate with a stiff broom making sure adequate slurry is observed on the surface. While either the Bond or Slurry coat is still wet and tacky apply the Sikafloor®-215 Rapid Screed and compact (tamp). Screed to falls and desired heights should be created during this process.
Note: Should the bond or Slurry coat skin prior to placement of Sikafloor®-215 Rapid Screed, remove and replace prior to further product being installed.
CLEANING OF EQUIPMENT
Clean all tools and equipment with warm water and detergent while the product is still wet.