2020
Chatswood, Sydney
Project Background
Following the discovery of large cracks in the concrete slabs a dual use commercial and retail complex in Chatswood was deemed to have structural strengthening issues in the multilevel carpark.
Project Requirement
- An Engineering report was completed and recommended significant structural strengthening was required to 2 levels in the carpark.
- The carpark slabs were to be strengthened around the pillars using a unique combination of Carbon fibre laminate and Carbon Rods.
- Once completed the repairs needed to be able to withstand high volume heavy vehicle traffic from both the residential tenants and commercial customers.
Sika Solution
- The Sika Carbodur rods were laid in the direction of the steel across the slabs whilst the Sikacarbodur S1012 Laminate was laid above the rods
- An Epoxy repair product Sikadur 31/41 was laid over the top of the repairs and to protect the Sikacarbodur and was sand seeded to an ant slip and abrasive resistant surface for the vehicle traffic
| Project Size | 392mts of SikaCarbodur S1012 112mts of SikaCarbodur BC16 350kgs of Sikadur 30 150kgs of Sikadur 31/41 |
| Sika Representative / Project Manager | Craig Adams |
| Date of Project | 16 March 2020 |
| Location | Glebe Island |
| Sika Customer / Contractor | Andersal Engineering |