Sikafloor® Level Eco
Sikafloor® Level Eco is designed for high build applications & often being installed by pumping equipment on commercial & domestic projects.
• Non-combustible • Green Star Certified • High strength
• Economical levelling solution
• Simply mix & apply - No slaking or re-mixing required
• Good pot life and working time - slow setting
• Pump or manual application
Usage
• Applied in combination with suitable materials fromSikafloor®, SikaBond®, Sikadur®, SikaTite® & Davco®
ranges. • Specially designed for pumping
• Recommended underlayment for all commercial &
residential floor coverings
• Levelling of uneven concrete up to 75mm
• Suitable for new or old internal concrete substrates
Advantages
• Very Low VOC (~1 gram per litre)• Non-combustible • Green Star Certified • High strength
• Economical levelling solution
• Simply mix & apply - No slaking or re-mixing required
• Good pot life and working time - slow setting
• Pump or manual application
Packaging
20kg Bag - 48 bags per pallet
Colour
Grey powder
Product Details
APPROVALS / CERTIFICATES
Green Star (VOC-SCQMD Rule 1168)
Composition
Polymer modified cement compound
Shelf life
Unopened bags can be stored for up to 9 months in a cool, dry and
weatherproof environment.
Storage conditions
Bags must be stored off the floor. Avoid sitting bags in direct sunlight prior
to application.
System structure
Porous Concrete | Moisture Barrier | Non-porous Surface |
Sikafloor® 01 Primer or Sikafloor® Level Pro Primer | Sikafloor®-158 W Fast | Sikafloor® 14 Prep 'N' Prime |
Sikafloor® Level Eco | Sikafloor® 14 Prep 'N' Prime | Sikafloor® Level Eco |
Subsequent suitable | Sikafloor® Level Eco | Subsequent suitable |
Subsequent suitable materials |
Compressive strength
1 day cure – 15MPa
28 day cure – 30MPa
Tensile strength in flexure
28 day cure – 5.5MPa
Water absorption
Porous
Reaction to fire
No hazardous combustion products are known
Application
Mixing ratio
3.5 - 3.8 Litres of clean, cool water
Layer thickness
3 - 75mm
Ambient air temperature
10°C - 35°C
Pot Life
20 Minutes @ 23°C
Initial set time
80 Minutes @ 23°C
Waiting time to overcoating
Allow 24+ hours at 23°C prior to the application of floor coverings.
Drying is dependent on thickness of application, temperature, air flow &
relative humidity.
Increased air flow will help with drying speeds in cooler temperatures.
Testing moisture content before applying floor coverings is recommended.
Yield
12L - 4m2 @ 3mm thickness
EQUIPMENT
- High speed heavy duty electric drill, mixing paddle & suitable size bucket/vessel - 20L +
- Purpose built mechanical pump
MIXING
Mix the entire 20kg bag of Sikafloor® Level Eco with
3.5 - 3.8 Litres of clean, cool water.
Slowly add powder to the water while mixing
thoroughly for 2 minutes to a lumpfree consistency.
Not mixing for the recommended time or additional
water may result in product irregularities and
possible product failure.
APPLICATION
Pour or Pump Sikafloor® Level Eco, then spread with a
long handled gauged spreader to heights as required.
For touch-ups, use a flat steel trowel. If vinyls are
being installed a skim coat of Sikafloor® Level Pro
Finish (smoothing compound) may be required.
Areas of application must have fresh airflow to assist
with product hydration and drying.
Closed off rooms with no fresh air will retard the
curing process and possibly lead to product failure.
.
Second applications:
If required, a second coat may be applied as soon as the first coat is firm enough to walk on without causing excessive damage, approximately 2 hours @ 23°C but no later than 4 hours @ 23°C.
This installation method is referred to as "wet-on-wet"
and higher temperatures/air flow will mean this
"wet-on-wet" second application time window is
reduced, therefore the second coat should always
be applied as soon as possible.
Note:
If the first application is allowed to dry past 4 hours
@ 23°C, re-priming & subsequent applications
should be applied the next day - Normal drying
times apply (24+ hours @ 23°C)