SikaBond®-150 Premium Floor
SikaBond®-150 Premium Floor is a 1-component, solvent-free, universal pressure-sensitive dispersion adhesive.
- Very easily spread
- Low consumption / high coverage
- High initial adhesion power
- Suitable for wet and semi-wet bonding
- Suitable for use with underfloor heating
- Suitable for use with castor-chairs
- Suitable for shampooing
- Suitable for difficult coverings
Usage
SikaBond®-150 Premium Floor is designed for full surface bonding of mentioned below floor coverings on absorbent and non-absorbent substrates in interior areas: Linoloum coveringsWoven fabricsNatural fibre coverings with backingSingle or multilayer needle feltingCarpets with PVC, PU or filler-free backingImpact sound insulation underlaysPVC and cushioned vinyl (CV) floor coveringsCorkment and cork linoleumRubber floor coverings as tiles (~3.5 mm, e.g. Norament)Rubber floor coverings in sheets (e.g. Noraplan)Advantages
- Very easily spread
- Low consumption / high coverage
- High initial adhesion power
- Suitable for wet and semi-wet bonding
- Suitable for use with underfloor heating
- Suitable for use with castor-chairs
- Suitable for shampooing
- Suitable for difficult coverings
Packaging
14 kg plastic pail
Colour
Beige
Product Details
SUSTAINABILITY
- EMICODE EC1PLUS
APPROVALS / CERTIFICATES
- Marine Equipment Directive (MED, "wheelmark")
Composition
1-Component dispersion
Shelf life
SikaBond®-150 Premium Floor has a shelf life of 12 months from the date of production, if it is stored properly in undamaged, original, sealed packaging, and if the storage conditions are met.
Storage conditions
SikaBond®-150 Premium Floor shall be stored in dry conditions, protected from direct sunlight and at temperatures between +5 °C and +25 °C.
Density
~1.20 kg/l | (ISO 1183-1) |
Consistency
Middle viscous, spreads very easily
Service temperature
+5 °C to +35 °C
Application
Ambient air temperature
+15 °C to +35 °C
Relative air humidity
40% to 60%
Substrate temperature
During laying and until SikaBond®-150 Premium Floor has fully cured, the substrate and ambient temperatures shall be between +15 °C and +35 °C without and between +20 °C and +35 °C with underfloor heating.
Substrate moisture content
Permissible substrate moisture content without underfloor heating:
Where moisture readings exceed 13.4g/m2 per 24 hrs and 85%RH when installing breathable floor coverings such as carpets. Or ~9g/m2 per 24 hrs and 80% RH prior to install linoleum or rubber.
Permissible substrate moisture content for use with underfloor heating:
Where moisture readings exceed 13.4g/m2 per 24 hrs and 83%RH when installing breathable floor coverings such as carpets. Or ~9g/m2 per 24 hrs and 80% RH prior to install linoleum or rubber.
Note: AS 1884-2012 should be followed in conjunction with the guidelines of the soft floor manufacturer.
Curing time
~24 h (final strength after ~72 h)
Skin time / laying Time
~20–60 min (depending on laying method)
Flash-off time
~10–60 min
Consumption
~250 g/m2 Trowel V1 |
| |
~250–280 g/m2 Trowel V1/V2 | PVC design floors, rubber floor coverings | |
| PVC floor coverings with structured backing, carpets with PVC backing, insulation underlays, rubber floor coverings (~3.5 mm) | |
| Linoleum coverings | |
~350–400 g/m2 Trowel V2 | Textile floor coverings, needle felting |
Note:
- Coverage must be monitored to ensure accuracy of application. Trowel
angle may prevent proper coverage.
- Applicator is responsible for periodic inspection of the trowel to check for
excessive wear. Worn trowels must be replaced immediately.
Trowel V1 or V2, according to product selection.
APPLICATION INSTRUCTIONS
For the application of SikaBond®-150 Premium Floor all standard construction guidelines and relevant valid data sheets apply.
SUBSTRATE PREPARATION
- The substrate must be clean, dry, sound and homogeneous, free from oils, grease, dust and loose or friable particles. Paint, cement laitance and other poorly adhering contaminants must be removed.
- SikaBond®-150 Premium Floor adheres without primers and/or activators.
- The subfloor must meet the requirements of national standards, must have good compression and tensile strength and has to be even.
- Defective subfloors shall be treated by taking appropriate measures e.g. grinding, milling, vacuuming, priming or self-levelling.
- Mastic asphalt and other non-absorbent subfloors as well as rubber floor coverings may require specific self-levelling compound layer thicknesses. For appropriate layer thicknesses refer to the relevant valid data sheets.
- Concrete and/or cement screeds must be ground and thoroughly cleaned with an industrial vacuum.
- When installing floor covering with underfloor heating, existing measuring points have to be checked regarding the moisture content of the subfloor.
CLEANING OF EQUIPMENT
Clean tools immediately in water with low surface
tension.