Search results  31  in 256,5 ms
           
No Download/Name Doctype Lang Format Size
1 Residential Rooftop Entertaining Area Project Reference Project Reference English pdf 0,87 MB
Residential Rooftop Entertaining Area Project Reference

Short description

Due to the existing bitumen membrane breaking down on the 1940’s brick apartment building, water was found to be leaking into the below neighbouring apartments. After the initial inspection of the building was carried out by our technical representatives, the project was deemed to required a long term waterproofing solution for the front and back rooftop decks of the building.

Date: 8/25/14
4 St Leonards Ave St Kilda Project Reference.pdf
Download pdf

2 Residential Sarnafil Decor Profiles.pdf Project Reference English pdf 0,46 MB
Residential Sarnafil Decor Profiles.pdf

Date: 3/18/14
Residential Sarnafil Decor Profiles.pdf
Download pdf

3 Riviera Appartments – 1000m2 Planter Box’s Project Reference English pdf 0,20 MB
Riviera Appartments – 1000m2 Planter Box’s

Short description

2 years ago these various intensive planter boxes throughout the apartment complex and over the basement car park were installed.

Date: 12/12/12
ProjRef_Sml_Riviera.pdf
Download pdf

4 Roofing Hotel West End Backpacker Hostel Project Reference English pdf 1,50 MB
Roofing Hotel West End Backpacker Hostel

Short description

To waterproof the external roofing deck due to failed existing waterproofing membranes.

Date: 12/12/12
ProjRef_Sml_HWE-Roofing.pdf
Download pdf

5 Rural Victoria - Dalyston Green Roofing Project Project Reference English pdf 0,99 MB
Rural Victoria - Dalyston Green Roofing Project

Short description

A complete peace of mind waterproofing/roofing membrane for the saturated environment of an extensive greenroof. The concrete deck was directly over the living spaces of this holiday house between Wohthaggi and Philip Island.

'MUST NEVER LEAK' were the words from the design architect and part owner of the dwelling. The greenroof needed to integrate into the coastal bushland to minimize the dwellings footprint on the natural environment. Also having an entertaining area adjacent made the aspect more inviting.

Date: 5/13/13
ProjRef_Sml_Dalyston.pdf
Download pdf

6 Saffire Frecyinet Resort Project Reference Project Reference English pdf 0,86 MB
Saffire Frecyinet Resort Project Reference

Short description

The Saffire Freycinet Resort, located on Tasmania’s gorgeous East Coast is considered a coastal sanctuary, delivering sophisticated and intimate style and an inspirational experience. Sika were happy to deliver a waterproofing & roofing solution for the resorts main building and 22 suites.

Date: 11/20/14
Saffire Frecyinet Resort Project Reference.pdf
Download pdf

7 Sarnafil to Commercial Building 75 George St, Parramatta Project Reference English pdf 2,00 MB
Sarnafil to Commercial Building 75 George St, Parramatta

Short description

To provide a waterproof membrane to replace an existing failed liquid waterproofing coating to a ballast area and unballasted roof area totaling 1000 sqm and provide a 15 year product warranty.

Date: 5/13/13
ProjRef_Sml_ParraSarnafil.pdf
Download pdf

8 Sika’s first Australian Green Roof Project Reference English pdf 0,60 MB
Sika’s first Australian Green Roof

Short description

Sika’s first Australian Green Roof, Waterloo Youth Facility, Sydney NSW

Date: 12/12/12
ProjRef_Lrg_Green-Youth.pdf
Download pdf

9 University of Canberra Project Reference Project Reference English pdf 0,78 MB
University of Canberra Project Reference

Short description

Due to the main HUB of the university leaking for many years, causing damage to the shops in the lower levels, the project required a long term waterproofing solution for the roof of the building.

Date: 8/25/14
University of Canberra Project Reference.pdf
Download pdf

10 Victorian Desalination Plant – Relying on Sika Project Reference English pdf 3,43 MB
Victorian Desalination Plant – Relying on Sika

Short description

The Victorian Desalination plant is a $3.5 billion project built to secure Melbourne’s water requirements.

Date: 12/12/12
ProjRef_Lrg_VicDeSal=All.pdf
Download pdf