Search results  29  in 182,4 ms
           
No Download/Name Doctype Lang Format Size
1 Melbourne City Baths Structural Strengthening Project Reference English pdf 1,09 MB
Melbourne City Baths Structural Strengthening

Short description

The Melbourne City Baths was first opened in 1860 and has continued to provide health and fitness services to the community for more than 140 years, an achievement that distinguishes the baths from any other health and fitness facility in Victoria.

Date: 12/12/12
ProjRef_Sml_MelbBath.pdf
Download pdf

2 Molendinar Water Treatment Plant Project Reference Project Reference English pdf 1,22 MB
Molendinar Water Treatment Plant Project Reference

Short description

Due to corrosion within numerous vertical wall panels and damage to the roof of the reservoir tank, Sika was asked to supply a refurbishment solution comprising of Carbon fibre structural strengthening and an anti-carbonation protective coating.

Date: 5/12/15
Molendinar Water Treatment Plant Project Reference-SML.pdf
Download pdf

3 Ormond College Masters Lodge Refurbishment Project Reference English pdf 1,03 MB
Ormond College Masters Lodge Refurbishment

Short description

The property manager for Ormond College in Royal Park, had been experiencing many leaks in the roof of the ‘Masters Lodge’, a heritage listed building/residence.

Date: 12/12/12
ProjRef_Lrg_Ormond.pdf
Download pdf

4 Residential Roof to Floor Project Project Reference English pdf 0,92 MB
Residential Roof to Floor Project

Short description

A residential client needed a roofing solution to protect their newly-constructed new living areas.

Date: 12/12/12
ProjRef_Lrg_Jansz_RtF.pdf
Download pdf

5 Sydney Harbour Bridge Waterproofing & Restoration Project Reference English pdf 1,65 MB
Sydney Harbour Bridge Waterproofing & Restoration

Short description

In January 2012 the Sydney Harbour Bridge underwent it’s largest refurbishment since construction. Works included resurfacing and replacement of its original and now 80 year old waterproofing system.

Date: 12/12/12
ProjRef_Lrg_SHB-12.pdf
Download pdf

6 The MCG Refurbishment - Relying on Sika Project Reference English pdf 1,36 MB
The MCG Refurbishment - Relying on Sika

Short description

The MCG Refurbishment
- Relying on Sika

Date: 12/12/12
ProjRef_Lrg_MCG-All.pdf
Download pdf

7 TWay Shelter Sealing with Sikaflex PRO.pdf Project Reference English pdf 1,81 MB
TWay Shelter Sealing with Sikaflex PRO.pdf

Date: 3/18/14
TWay Shelter Sealing with Sikaflex PRO.pdf
Download pdf

8 Wimmera Bridge Horsham Project Reference Project Reference English pdf 0,70 MB
Wimmera Bridge Horsham Project Reference

Date: 7/24/14
Wimmera Bridge Horsham Project Reference-SML.pdf
Download pdf

9 Winchelsea Bridge Project Reference Project Reference English pdf 1,26 MB
Winchelsea Bridge Project Reference

Short description

Sika Carbon fibre laminates M1214 and M614 was installed on the underside concrete beams of the bridge with the Sika 230C carbon fibre wrap installed on the crossed heads sections and columns of the bridge.

Date: 5/13/15
Winchelsea Bridge Project Reference-SML.pdf
Download pdf