2014
Łódź, Poland
Project Requirements
The main requirements of this project were high crack bridging ability even at low temperatures and a fast curing solution due to the unstable weather conditions in the area, especially for the top deck laying. Adequate waterproofing, and surface protecting features for a car park have been recognized as primary factors for the high viability of such a new-build project.
Sika Solutions
According to the above requirements, the specified system by Sika Poland for this project was the Sikafloor® pronto-RB58 system for the top deck 6,000 m² and Sikafloor® MultidurES14 system for the intermediate floor 6,000 m².
Products Used
Sikafloor®-11 Pronto
Sikafloor®-32 Pronto
Sikafloor®-18 Pronto
Sika®-Reemat Premium
Sikafloor®-161
Sikafloor®-264
Note: Not all products are available in Sika Australia. Please contact your local technical sales representative for availabilities.
Project Participants
Project Owner
Union Investment Real Estate AG
Architect
Sud Architekt Polska Sp. z o.o.
Engineer
Abatos Sp. z o.o.
Contractor
P.I.B Budecon S.A. – Flooring Sub-contractor Chembud Warsaw
Sika Organization
Sika Poland